Websites for Tradespeople
Menu

Method statement and RAMS template

A method statement sets out, step by step, how a job will be done safely. A risk assessment sets out what could cause harm and what you will do about it. Together they are a RAMS. A risk assessment is a legal requirement (written down if you employ five or more people); a method statement is not, but principal contractors will ask for one. Download the blank template, or build a site-specific RAMS here.

Download the blank template

Free, no email needed. Word to fill in on a computer, PDF to print.

Loading the RAMS builder...

Legal position and hazard controls written from HSE guidance and legislation.gov.uk, read 18 Sep 2026. Everything you type stays in your browser.

The 5 by 5 risk matrix

Set the likelihood and the severity to see the score and what the band means. Low is 1 to 5, Medium 6 to 12, High 15 to 25.

Risk rating

20 High

4 x 5 = 20. Do not start until the risk is reduced. Add controls higher up the hierarchy: avoid the risk, reduce it at source, guard or isolate it, then procedures and training, then PPE.

Likelihood down the side, severity along the top. Low 1 to 5, Medium 6 to 12, High 15 to 25: no two scores multiply to 13 or 14.
Likelihood1. Minor injury, first aid2. Injury needing treatment3. Injury with time off work4. Major injury or long-term illness5. Death or permanent disability
5. Very likely
4. Likely
3. Possible
2. Unlikely
1. Very unlikely

No law requires a scored matrix: HSE's own risk assessment template does not score. Principal contractors usually expect one.

What is a method statement?

A method statement describes how one job will be done safely, in the order it is done: who does each step, with what equipment, and with which controls in place. It is written for one job on one site, and the people doing the work read it and sign to say they understand it before they start.

Principal contractors, commercial clients and accreditation schemes ask for one before you start, mostly for higher-risk work: height, excavation, hot works, confined spaces and live electrical work. It is also how you show you have planned the work, which is a duty under CDM 2015.

RAMS template: risk assessment and method statement together

A RAMS is the two documents together. The risk assessment says what could hurt someone on this job and how likely and how bad it would be. The method statement says how the job is done so that it does not. The hazards in one should appear as controls in the other: if the risk assessment lists falls from the roof edge, a step in the method should say where the edge protection goes and when.

The builder here links them: every step of the method picks its hazards from the risk assessment, and the exported RAMS shows them side by side. The RAMS download puts the risk assessment first; the method statement download puts the method first. The content is the same.

How to write a method statement

1. The job: say what the work is, where, and the dates and hours. Use the trade that matches, so the right hazards load. 2. Company and site: your details, the site address, the client or principal contractor, and a site contact. 3. People: name everyone, their role and their cards (CSCS, ECS, Gas Safe, PASMA, IPAF, first aid), and the supervisor. 4. Plant, tools and substances: what you will bring and use, and a safety data sheet for each hazardous substance.

5. Risk assessment: each hazard, who it could harm, the controls, the risk before and after them, and who acts. 6. Method: the sequence of work, step by step, with the hazards and controls for each step. 7. Arrangements: first aid, fire, welfare, permits, PPE, waste, and who checks the work follows the method. 8. Sign-off: who prepared and approved it, and a briefing record every worker signs.

What to include in a method statement

  • Document control: version, date, who prepared and approved it, and when it is reviewed. So everyone works to the same copy.
  • Job and site details. A RAMS is for one site; the site address is what makes it site-specific.
  • People and competence. CDM asks you to check skills, knowledge, training and experience.
  • Plant, tools, materials and substances. So the controls match the equipment really used.
  • The risk assessment, with the matrix key if you score. So the reader sees the risk and the reduction.
  • The sequence of work. So the method matches how the job is really done.
  • Emergency and welfare arrangements. So everyone knows what to do if it goes wrong.
  • The briefing record. Proof the team read it.

The 5 by 5 risk matrix explained

Score likelihood from 1 (very unlikely) to 5 (very likely) and severity from 1 (minor injury, first aid) to 5 (death or permanent disability), then multiply. Low is 1 to 5, Medium 6 to 12, High 15 to 25. No two numbers from 1 to 5 multiply to 13 or 14, so there is nothing between 12 and 15.

A roofer on a pitched roof with no edge protection: falls from height are likely (4) and could kill (5), 4 x 5 = 20, High. With a scaffold and double guard rails the fall is unlikely (2) but would still be as serious (5): 2 x 5 = 10, Medium. Controls usually lower the likelihood, not the severity.

No law requires a scored matrix: HSE's own template does not score. Principal contractors usually expect one. The builder offers 5 by 5, 3 by 3, or no scores in HSE's style. When choosing controls, work down the order in the regulations: avoid the risk, reduce it at source, protect everyone with collective measures (scaffold, guarding, isolation), then procedures and training, and personal protective equipment last.

Method statement examples by trade

Roofing, re-roof a semi: falls from height, falling through fragile surfaces, falling materials and tools, among 15 hazards, and a 7-step method from scaffold handover to strike. Load the roofing example, or see websites for roofers.

Electrical, rewire a kitchen: falls from height, manual handling, disturbing asbestos, with safe isolation (isolate, lock off, prove dead) as its own step. Load the electrical example. Websites for electricians.

Plumbing and heating, replace a boiler: falls from height, manual handling, disturbing asbestos, gas isolation and tightness testing. Load the plumbing example. Websites for plumbers.

Building, build a garden wall: falls from height, falling through fragile surfaces, falling materials and tools, services checked before digging. Load the building example. Construction websites.

Landscaping, lay a patio: manual handling, weather: wind, rain, ice, heat and sun, residents and members of the public near the work, buried services and silica dust from cutting paving. Load the landscaping example. Websites for landscapers. Carpentry, fit a kitchen: falls from height, manual handling, disturbing asbestos. Load the carpentry example. Websites for carpenters.

Why the HSE method statement template does not exist

HSE publishes a risk assessment template (opens in a new tab) in Word and OpenDocument formats, with worked examples for an office, a shop, food preparation, a vehicle repair shop, factory maintenance and a warehouse. It does not publish a method statement template, because the method statement is not an HSE requirement. Its template follows its five steps: identify the hazards, assess the risks, control the risks, record your findings, review the controls.

HSE is plain about examples: "Do not just copy an example and put your company name to it as that would not satisfy the law and would not protect your employees." The builder is built around that sentence. Every hazard it loads is marked as a preset until you change it or confirm it fits the site, and it will not export without a site address, dates and named people.

Briefing your team

A RAMS nobody has read protects nobody. Go through it with the people doing the work before they start, and have each sign the briefing record: "I have read and understood this RAMS". CDM 2015 requires a suitable, site-specific induction for workers, unless the principal contractor has already given one.

Keep a copy on site, brief anyone who joins later, and revisit it when the job changes. HSE's advice on assessments applies here too: "involve your employees as they will usually have good ideas". The signed briefing record also shows the job was run properly if a customer later questions the work to avoid paying (customer refusing to pay).

Common mistakes

  • A generic document copied from the last job with the address changed.
  • Residual scores that are the same as the initial scores, so the controls did nothing.
  • No named supervisor, or no names at all.
  • No dates, so nobody knows which job it was for.
  • A method that does not match how the job is actually done.
  • A RAMS written, filed and never briefed.

Frequently asked questions

How do you write a method statement?

Describe the job and site, name the people and their cards, list the plant and substances, assess the risks, write the sequence of work step by step with the controls for each, add first aid, fire and welfare arrangements, and finish with sign-off and a briefing record.

What are the 5 things a risk assessment should include?

HSE's five steps: identify the hazards, assess the risks, control the risks, record your findings, and review the controls.

Is a method statement a legal requirement?

No. A risk assessment is (recorded in writing if you employ five or more people). A method statement is the usual way to show you have planned the work as CDM 2015 requires, and principal contractors ask for one.

Where can I find a free Safe Work Method Statement template?

Safe Work Method Statement (SWMS) is the Australian name for the same document. The free method statement template on this page covers it, in Word and PDF, with a builder to fill it in.

How do you write a safe work method statement?

The same way as a UK method statement: the job, the people, the hazards and controls, the steps in order, the emergency arrangements and a sign-off. The builder here walks through each part.

What is a template method statement?

A blank method statement with the sections laid out, ready to fill in for one job and one site. Filling it in for the site is what makes it valid; a copied example is not enough.

Can you provide an example of a RAMS template?

Yes. Pick a trade in the builder and it loads a worked example (for a roofer, a re-roof with 15 hazards and a 7-step method) for you to change to your site. Download the blank RAMS in Word or PDF above.

Can I write my own fire risk assessment?

For most small premises, yes: GOV.UK sets out when you can do it yourself and publishes guides. This tool is not a fire risk assessment; it covers the fire risks of the job itself, such as hot works.

Where can I download a template for risk assessment?

HSE publishes a free risk assessment template in Word and OpenDocument formats. The RAMS template on this page adds the method statement and trade hazards.

Can I create my own risk assessment?

Yes. You must make one if you are an employer or self-employed, and you can do it yourself if you are competent to. HSE's five steps are the structure.

Is there any free software I can use for risk assessments?

The builder on this page is free with no account, and HSE's risk assessment template is free. Paid RAMS software adds storage and team features.

How to write up a risk assessment template?

For each hazard: who might be harmed and how, the controls already in place, the risk rating, further controls needed, who acts and by when. Record it, and review it when the work changes.

Do I need a method statement for a domestic job?

Usually no one asks for one on a small domestic job, but you still need a risk assessment, and CDM 2015 still applies to domestic projects, including the construction phase plan.

How long does a RAMS last?

For the job it was written for. Review it when the method, the site, the team or the risks change, and write a new one for the next job.

Who signs a method statement?

The person who prepared it, the person who approved it (often the principal contractor), and every worker, on the briefing record, to say they have read and understood it.

Can I use one method statement for every job?

No. HSE: "Do not just copy an example and put your company name to it as that would not satisfy the law and would not protect your employees." Start from a template, then make it fit the site.

Sources

This tool builds a document from what you type. It does not assess your site: you remain responsible for its content, and high-risk work should be checked by a competent person. It is not a fire risk assessment or a construction phase plan.

By Janusz Wozniak, Founder & Lead Developer

Built because every free RAMS template online is a download with no help filling it in, or a way into a subscription. This one fills itself in from your answers and keeps them on your device.

Last updated .

They look at your website before your RAMS

Principal contractors look at your website before they look at your RAMS. If yours doesn't show your accreditations, insurance and past jobs, you are losing the tender before it starts.

Put this calculator on your site

Free for any website: accountants, trade bodies, contractors. Paste this code where you want it to appear.

Call 0161 399 4054Get my website plan